Ninety meters below the waters of Saltsjön — the sea inlet that surrounds Stockholm — workers are excavating what will become the deepest point of the Swedish capital’s future metro network. This single figure speaks to the scale of a project that, kilometer by kilometer, is reshaping the city from the inside out.
Construction is currently underway on 30 kilometers of new underground track and 19 stations distributed across the metropolitan area. It stands as one of the most ambitious infrastructure undertakings Sweden has seen in decades, both in terms of its technical complexity and the investment it demands.
The challenge of boring through a city like Stockholm — built on rock, water, and centuries of urban history — calls for intricate engineering solutions and relentless work carried out far from public view. Tunnel boring machines, controlled explosions, and specialized crews are on the job every day, carving the path for what will become the future of public transit in the region.
Once all the lines are operational, thousands of daily commuters will be able to travel routes that do not yet exist, easing the strain on a network that has been running at or beyond capacity for years.
Original source: SVT Nyheter



